1.8m Trapdoor Platform non-slip plywood (1pc)(TK/Loyal)
For replacing the plywoods of 1x 1.8m trapdoor platform
1x Fixed platform plywood and 1X trapdoor plywood for 1.8m
1.8M Trapdoor & Fixed Platform non-slip plywood (1pc)(Loyal)
EXCL. VAT: £94.68
INCL. VAT: £113.62
FREE next day delivery*
In stock
Weight (kg) | 5 |
---|---|
Number of Packs | 1 |
1 review for 1.8M Trapdoor & Fixed Platform non-slip plywood (1pc)(Loyal)
Only logged in customers who have purchased this product may leave a review.
Related products
Stainless Steel Wing Nuts (4pc) (for Trade King / Loyal Tower)
Industrial and trade tower accessories
Stainless Steel Wing Nuts (4pc) (for Trade King / Loyal Tower)
EXCL. VAT: £21.57
INCL. VAT: £25.88
850 (SW) 2 Rung Span and Ladder Frames 850X1000 (1set)
Industrial and trade tower accessories
EXCL. VAT: £177.13
INCL. VAT: £212.56
Diagonal Brace 2.61m (4pc)
Industrial and trade tower accessories
EXCL. VAT: £224.06
INCL. VAT: £268.87
Outrigger foot with screw & nut (2pc) (for SP07, SP10)
Industrial and trade tower accessories
EXCL. VAT: £24.83
INCL. VAT: £29.80
Snap Pins - 9.2mm (4pc) (for Trade King / Loyal Tower)
Industrial and trade tower accessories
EXCL. VAT: £14.99
INCL. VAT: £17.99
Telescopic Outrigger SP10 - Medium (1pc)
Industrial and trade tower accessories
EXCL. VAT: £138.88
INCL. VAT: £166.66
Horizontal brace 2.5m (2pc)
Industrial and trade tower accessories
EXCL. VAT: £123.45
INCL. VAT: £148.14
Fixed Platform 0.6mX2.5m (1pc)
Industrial and trade tower accessories
EXCL. VAT: £252.03
INCL. VAT: £302.44
Scaffold Tags with 10 Inserts
Industrial and trade tower accessories
EXCL. VAT: £17.02
INCL. VAT: £20.42
Snap Pins - 9.2mm (8pc) (for Trade King / Loyal Tower)
Industrial and trade tower accessories
EXCL. VAT: £19.71
INCL. VAT: £23.65
Diagonal Brace 2.1m (2pc)
Industrial and trade tower accessories
EXCL. VAT: £113.36
INCL. VAT: £136.03
Telescopic Outrigger SP15 - Large (4pc)
Industrial and trade tower accessories
EXCL. VAT: £1155.25
INCL. VAT: £1,386.30
Craig Eastwood (verified owner) –
Product great but expected the boards to be pre-drilled